During an inspection of the ventilation unit, it turns out that the filter cannot be pulled out. There is insufficient space to open the doors of the electrical switchboard, and a pipeline blocks access to the pump. These problems are often not visible during installation. They only become apparent during repairs, equipment replacement or expansion. The reasons may include an overly cramped layout and a lack of coordination between different disciplines.
Already during the design stage, it is necessary to consider how technicians will later inspect the operation of the installations. It is not enough to provide space for a voltmeter to check the installation or other instruments. Convenient access to the equipment must also be ensured. If measurement points are obstructed by cables, pipes or adjacent equipment, even a routine inspection can become a problem.
How to Determine the Requirements and Size of a Technical Room?
First, determine what will actually be installed inside. An electrical switchboard, a ventilation plant room and a water installation room have different requirements. Simply listing the dimensions of the equipment is not enough to determine the area. The service zones specified by manufacturers, as well as the space required for opening enclosures and removing components, must also be considered.
Before approving the layout, check three situations:
-
Can a filter, module or drawer be pulled out without dismantling the adjacent installation?
-
Will the largest non-disassemblable component pass through the doors and corridors during future replacement?
-
Is there space for anticipated expansion and additional routes?
Not everything can be safely combined in one room either. Electrical equipment and water installations may have different environmental and access requirements. The architect must discuss these issues with the discipline designers sufficiently early. Once the walls and openings have been established, making changes can be difficult.
How to Plan Installations and Technical Equipment?
A switchboard positioned against a wall may not cause a problem—until a ventilation duct appears in front of it. The same applies to automation: a control cabinet occupies little space, but someone still needs to open it and access the connections. In HVAC equipment, it is particularly easy to overlook the space required to remove maintenance components. At this stage, determine which parts require regular inspections and which are removed only in the event of a failure. This helps in planning access routes.
Therefore, during installation coordination, check not only whether pipes, cables and ventilation ducts overlap. The opening zones of covers, technicians’ working areas and routes for removing equipment are also important. A BIM model helps identify such conflicts, provided it includes service space and not just the equipment volumes.
Measurement points and control elements should be placed in locations accessible during routine inspections. There is no point in hiding readings behind pipes or routing cables in such a way that their replacement later requires dismantling half of the room.
How to Ensure Safe Access and Appropriate Operating Conditions?
A service technician should not have to squeeze sideways between operating equipment to reach a valve or cover. Access routes must allow actual maintenance work to be carried out, with adequate lighting and without blocking adjacent equipment.
The conditions in the room must also be checked against the specific equipment:
-
Heat: Determine the heat losses from the equipment and, based on this, select the ventilation system and the method of heat dissipation.
-
Moisture: Assess the risk of condensation and leaks, especially near electrical equipment.
-
Safety: Ensure access for authorised personnel and do not use technical rooms for storing flammable materials.